Tool · Interactive checklist

Prepare your connection file, document by document.

Tick what you have already gathered before applying for a connection to the grid or asking for a transformer substation quote. The electricity distributor specifies the exact list of documents; this list helps you prepare for it.

For a new connection or substation
For an existing substation
Documents gathered0

The electricity distributor specifies the exact list of documents. This list helps you prepare the file and our quote.

Request a quote

Why a complete file saves time

A connection application or a substation quote is studied on the basis of documents. As long as a drawing, a power figure or the location of the substation is missing, the study stops or rests on assumptions that will have to be revisited. Each round trip to complete a file pushes back everything that follows by as much: the distributor’s answer, the order for the equipment, the start of the works. Gathering the documents before submitting the application is the simplest way to keep to a schedule.

A complete file also improves the quality of the answers. A contractor that has the drawings, the list of equipment and the constraints of the site prices what will actually be built, and not a cautious default solution. This list does not replace that of the electricity distributor, which specifies the documents required for each application: it lets you arrive prepared, with the information that every party will ask for.

Who provides what

The project owner provides what relates to the project itself: the identity of the applicant, the documents relating to the land, the nature of the activity, the date by which the site must be supplied. The architect or the design office provides the drawings: location of the land, site plan showing where the substation is to stand, building drawings. Where there is one, the specification of the electrical work package is one of these documents.

The electrical contractor provides the technical part: the load assessment, the single-line diagram, the characteristics of the substation equipment and the route of the link. It can also help the project owner to bring everything together and to answer the distributor’s technical questions. On its transformer substation projects, In All Africa (IN2A) works from the first site survey through to energising, in coordination with the distributor.

The usual split

  • Project owner: identity of the applicant, documents for the land, activity, desired date
  • Architect or design office: location plan, site plan, building drawings
  • Design office: specification of the electrical work package, where there is one
  • Electrical contractor: load assessment, single-line diagram, characteristics of the substation
  • Electricity distributor: exact list of the documents required

The equipment this guide is about

MV/LV substations · See the service

A model of principle: typical equipment, not the mock-up of a particular installation.

Your questions

01Is the list of documents the same everywhere?

No. Each electricity distributor specifies the documents it asks for, and the list may vary with the nature and the power of the connection. This tool brings together the information that is most often useful for preparing the application; it does not replace the list the distributor will give you.

02Can a substation quote be requested with an incomplete file?

Yes. In All Africa (IN2A) can draw up a first estimate from the information available, stating the assumptions made. A site visit and the missing documents then make it possible to refine it. The more complete the file is at the outset, the less the final quote differs from the first.

Let’s talk about your project

Is your file ready?

A work package to price, a substation to renovate, a home to equip: tell us what you need and we will get back to you.