Prepare your connection file, document by document.
Tick what you have already gathered before applying for a connection to the grid or asking for a transformer substation quote. The electricity distributor specifies the exact list of documents; this list helps you prepare for it.
The electricity distributor specifies the exact list of documents. This list helps you prepare the file and our quote.
Request a quoteWhy a complete file saves time
A connection application or a substation quote is studied on the basis of documents. As long as a drawing, a power figure or the location of the substation is missing, the study stops or rests on assumptions that will have to be revisited. Each round trip to complete a file pushes back everything that follows by as much: the distributor’s answer, the order for the equipment, the start of the works. Gathering the documents before submitting the application is the simplest way to keep to a schedule.
A complete file also improves the quality of the answers. A contractor that has the drawings, the list of equipment and the constraints of the site prices what will actually be built, and not a cautious default solution. This list does not replace that of the electricity distributor, which specifies the documents required for each application: it lets you arrive prepared, with the information that every party will ask for.
Who provides what
The project owner provides what relates to the project itself: the identity of the applicant, the documents relating to the land, the nature of the activity, the date by which the site must be supplied. The architect or the design office provides the drawings: location of the land, site plan showing where the substation is to stand, building drawings. Where there is one, the specification of the electrical work package is one of these documents.
The electrical contractor provides the technical part: the load assessment, the single-line diagram, the characteristics of the substation equipment and the route of the link. It can also help the project owner to bring everything together and to answer the distributor’s technical questions. On its transformer substation projects, In All Africa (IN2A) works from the first site survey through to energising, in coordination with the distributor.
The usual split
- Project owner: identity of the applicant, documents for the land, activity, desired date
- Architect or design office: location plan, site plan, building drawings
- Design office: specification of the electrical work package, where there is one
- Electrical contractor: load assessment, single-line diagram, characteristics of the substation
- Electricity distributor: exact list of the documents required
A model of principle: typical equipment, not the mock-up of a particular installation.
Your questions
01Is the list of documents the same everywhere?
No. Each electricity distributor specifies the documents it asks for, and the list may vary with the nature and the power of the connection. This tool brings together the information that is most often useful for preparing the application; it does not replace the list the distributor will give you.
02Can a substation quote be requested with an incomplete file?
Yes. In All Africa (IN2A) can draw up a first estimate from the information available, stating the assumptions made. A site visit and the missing documents then make it possible to refine it. The more complete the file is at the outset, the less the final quote differs from the first.
Read next

Running a transformer substation project
Who decides what, when and with whom: this guide follows a transformer substation project as the client experiences it, from the first power estimate to the handover of the documentation.
Read the guide
Choosing your electrical contractor
References, design, team, tests, maintenance: the questions to ask before entrusting an industrial or commercial project to an electrical contractor, and how to compare quotes that do not all cover the same thing.
Read the guideEstimate the power of a transformer
From the installed power, a simultaneity factor, the power factor and a reserve, this tool gives an order of magnitude for the power of the transformer. A load study must then confirm it.
Open the toolRelated services
The In All Africa (IN2A) trades linked to this subject.
Is your file ready?
A work package to price, a substation to renovate, a home to equip: tell us what you need and we will get back to you.
- +212 522 212 298
- commercial@inallafrica.com
- 86, lot. Mandarouna, rue 23, Aïn Chock, Casablanca