Service 01 · From grid connection to distribution

From the 22 kV grid to the last socket.

Grid connection, MV/LV substations, distribution, lighting and standby power: In All Africa (IN2A) designs and builds the entire electrical chain of your site.

The power systems work package, from end to end

Power systems carry energy: they supply the machines, the lighting, the air conditioning and every socket in a building. On an industrial or commercial site, this work package starts at the point of connection to the public grid and ends at the fittings installed in each room.

In All Africa (IN2A) designs power systems installations (CFO) and carries out the works. A single team handles the grid connection, the transformer substation, the main distribution, the switchboards and the final circuits, which avoids gaps in responsibility between work packages.

What the work package covers

  • Connection to the public MV/LV distribution grid
  • MV/LV transformer substations
  • Main distribution, cable trays and concealed distribution
  • Main low-voltage switchboard (TGBT), safety switchboard (TGS) and distribution boards
  • Electrical fittings (switches and sockets) and power supplies
From the grid to your machines
  1. 22 kV grid
  2. MV/LV substation
  3. Main switchboard (TGBT)
  4. Distribution boards
  5. Machines, lighting, sockets

A model of principle: typical equipment, not the mock-up of a particular installation. Schematic diagram: it shows how the parts follow one another, not the drawing of a particular installation.

Continuity of supply and power quality

A factory, a store or a public institution cannot stop at every grid outage. In All Africa (IN2A) installs the generator sets and the UPS-backed and standby networks that take over, and deals with the quality of the power distributed through reactive power compensation and harmonic filtering.

We also integrate on-site generation, with photovoltaic (solar PV) and cogeneration, and protect installations against lightning and surges.

Standby power and protection

  • Generator sets
  • UPS-backed and standby networks
  • Reactive power compensation, harmonic filtering
  • Photovoltaic generation, cogeneration
  • Lightning protection and surge protection

New build, extension or renovation: who the power systems work package is for

The power systems work package concerns any client who is building, extending or upgrading a building: manufacturers, retail chains, property developers, public authorities. In a new build, the installation is designed along with the building, as it was for the new Fenie Brossette manufacturing unit in Tit Mellil or the OFPPT institute and boarding school in Tafraout. In an extension, the question becomes one of available power and of the space left in the existing switchboards.

On an occupied site, the work is organised around the activity. Shutdowns are prepared with the operator, the new switchboards are assembled and wired before the changeover, and the circuits are taken over area by area so that the rest of the site keeps running. In All Africa (IN2A) also takes on one-off jobs: adding or replacing a switchboard, modifying a cabinet, connecting machines or production equipment.

Common situations

  • New building: complete electrical work package
  • Extension: new outgoing circuits and distribution boards
  • Renovation of an old installation
  • Addition or replacement of electrical switchboards
  • Connection of new production machines
  • Lighting renewal

TGBT, selectivity, load assessment: what the electrical study settles

The TGBT, the main low-voltage switchboard, is the point from which the whole distribution of a site starts: it receives energy from the transformer or the grid and shares it out among the distribution boards. Its sizing follows from the load assessment, that is, the inventory of the equipment to be supplied and of how much of it runs at the same time. An underestimated load assessment leads to repeated tripping and to a switchboard that is full at the first extension.

The study also settles the selectivity of the protective devices: if a fault occurs on a circuit, only the nearest protective device should open, so that the rest of the site stays supplied. Lastly, it determines the cable sizes, the cable routes and the spare capacity set aside for future needs. In All Africa (IN2A) draws up these calculations before the works, then checks the installation through tests before commissioning.

What to prepare for a quote

  • Drawings of the building and the plant rooms
  • List of the equipment to be supplied, with power ratings
  • Specification or description of the work package, if there is one
  • Diagrams of the existing installation, for a renovation
  • Operating constraints: working hours, possible shutdowns
  • Provisional schedule of the works

What we deliver

The power systems installations designed by In All Africa (IN2A), package by package.

Grid connection and MV/LV substations

From the public distribution grid to the substation on your site.

  • Connection to the public grid
  • MV/LV transformer substations
  • Reactive power compensation
  • Harmonic filtering

Distribution and switchboards

The main and sub-distribution of your buildings.

  • TGBT and TGS
  • Distribution boards
  • Cable trays
  • Concealed distribution
  • Electrical fittings
  • Power supplies

Standby power and generation

Continuity of supply and on-site generation.

  • Generator sets
  • UPS-backed and standby networks
  • Photovoltaic
  • Cogeneration

Lighting

Lighting installations, from design study to commissioning.

  • Indoor and outdoor lighting
  • Lighting calculations
  • Energy performance
  • Emergency lighting
  • Escape-route signage lighting

Protection of installations

The protection of equipment and buildings.

  • Lightning protection
  • Surge protection

Your project, step by step

From the first site visit to the upkeep of the installation.

1

Needs analysis

We study your drawings, your specification and the list of equipment to be supplied in order to draw up the load assessment of the site.

2

Study and pricing

We size the TGBT, the boards, the cables and the protective devices, then give you a detailed offer, package by package.

3

Works and testing

Our teams install the cable trays, the switchboards and the fittings, connect the circuits and check the installation before it is energised.

4

Operation and maintenance

After commissioning, we support you in the operation, maintenance and later changes of your electrical installation.

Power systems projects

Decathlon: the stores’ electrical package — Decathlon Morocco, Several citiesRetail
Several citiesDecathlon Morocco

Decathlon: the stores’ electrical package

Electrical works, fire detection, voice alarm sound system, intrusion detection, access control, video surveillance, structured cabling.

Power systemsLow-current systems
Compliance upgrade of the plant’s electrical substation — Centrale Danone, SaléIndustry
SaléCentrale Danone

Compliance upgrade of the plant’s electrical substation

Upgrade of the plant’s electrical substation to the standards in force.

Power systemsMV/LV substations
EHTP conference hall — École Hassania des Travaux Publics, CasablancaCommercial
CasablancaÉcole Hassania des Travaux Publics

EHTP conference hall

Electrical works, light fittings and fire detection.

Power systemsLow-current systems
Accommodation buildings of the Lycée d’Excellence — On behalf of OCP, BenguerirEducation
BenguerirOn behalf of OCP

Accommodation buildings of the Lycée d’Excellence

Power and low-current systems, 1,000 kVA substation, TGBT switchboards and LV distribution.

Power systemsMV/LV substationsLow-current systems
Ports
AgadirMarsa Maroc

Renovation of the port’s transformer substations

Renovation of the transformer substations at the commercial port.

Power systemsMV/LV substations
Industry
Tit MellilFenie Brossette

New manufacturing unit

Electrical installation, telephony and fire detection system.

Power systemsLow-current systems

Our power systems references

Client, scope of work and city, as they appear in our list of references.

ClientScope of workCityFields
Casa ISon behalf of OCPAccommodation buildings of the Lycée d’Excellence, blocks C1, C2, L1 and L2: electrical installation, power and low-current systems (fire detection, data cabling, evacuation and voice alarm sound system, access control, intrusion detection, TV distribution).BenguerirPower systemsLow-current systems
Trainveston behalf of OCPAccommodation buildings of the Lycée d’Excellence: electrical installation, power and low-current systems (1,000 kVA substation, TGBT and AGBT switchboards and LV distribution).BenguerirPower systemsMV/LV substationsLow-current systems
DecathlonConstruction of the Decathlon store: electrical works, fire detection, evacuation and voice alarm sound system, intrusion detection and access control, video surveillance, data cabling, transformer substation and car park lighting.MarrakechPower systemsLow-current systemsMV/LV substations
DecathlonConstruction of the Decathlon store: electrical works, fire detection, evacuation and voice alarm sound system, intrusion detection and access control, video surveillance, data cabling.Casablanca, Agadir, Tetouan, Fez, Kenitra, MeknesPower systemsLow-current systems
DecathlonConstruction of a commercial building: electrical works, fire detection, sound system and data cabling.Client attestation: 2017Rabat, OujdaPower systemsLow-current systems
Ministry of Youth and SportsSpecialised lighting of two training pitches at the Moulay Rachid National Sports Centre (single work package).SaléPower systems
Al Omrane MarrakechElectrification of the Sidi Rahal craft complex: transformer substation, street lighting and MV/LV link.MarrakechMV/LV substationsPower systems
ORMVALReplacement of the electric hoist of the lifting systems at the SPCII station, lower-hill sector of the Loukkos perimeter.Ksar El KebirPower systems
École Hassania des Travaux PublicsTechnical installation of the EHTP conference hall: electrical works, light fittings and fire detection.Client attestation: 2013CasablancaPower systemsLow-current systems
OFPPTConstruction of the Specialised Institute of Applied Technology and its boarding facility in Tafraout: electrical and light-fittings package.Client attestation: 2017TafraoutPower systems
ONPElectrical connection of the standardised container management unit at the port of M’diq.Client attestation: 2014M’diqPower systems
CasanearshoreStreet lighting of road 22.Client attestation: 2012CasablancaPower systems
Fenie BrossetteElectrical installation of the new manufacturing unit in Tit Mellil.Client attestation: 2010Tit MellilPower systems
Aglou CenterStreet and decorative lighting of the Aglou Centre tourist residential complex.Client attestation: 2015TiznitPower systems
Aglou CenterInstallation of a pumping station, including the monorail hoist, at the Aglou Centre tourist residential complex.Client attestation: 2015TiznitPower systems
BIMElectrical installation of the BIM warehouses.CasablancaPower systems
Genarle Golf FoncierConstruction of the Decathlon store in Agadir: transformer substation, lighting and MV link.AgadirMV/LV substationsPower systems
Set SécuritéSupply and installation of equipment for a 2,000 W IM floodlight.CasablancaPower systems
Data PlusModification and connection of an electrical cabinet.CasablancaPower systems
Tissir SoualemMV-LV electrification and street lighting of the Alia II housing development.Client attestation: 2010Had SoualemMV/LV substationsPower systems
ODEP CasaElectrical installations of the new Casa Port terminal.CasablancaPower systems
Green FactorysConstruction and fitting-out of a 160 kVA transformer substation with motorised switchgear cubicles, and low-voltage connection of the new unit.Client attestation: 2011KenitraMV/LV substationsPower systems
Fenie BrossetteInstallation of generator sets from 80 kVA to 300 kVA.Client attestation: 2005Power systems
Fenie BrossetteElectrical works at the Hadj El Arbi Ben M’Barek complex.Client attestation: 2005CasablancaPower systems
Data PlusElectrical installation of a production unit.Client attestation: 2007BouskouraPower systems
Crystal SoundElectrification of the production plant.Client attestation: 2003CasablancaPower systems
Alf El FellousMV-LV extension, electrical works and automation of the animal feed plant.Client attestation: 2003Bir JdidPower systemsMV/LV substations
Alf KamelMV/LV electrification and automation of an animal feed plant.Client attestation: 2003KenitraPower systemsMV/LV substations
DarelErection of masts and cubicles, installation and connection of floodlights and enclosures.Client attestation: 2003Power systems

Power systems: your questions

01What is the difference between power systems and low-current systems?

Power systems carry the electrical energy that supplies equipment: distribution, lighting, motive power. Low-current systems carry information: IT networks, telephony, fire safety, access control, video surveillance (CCTV). In All Africa (IN2A) delivers both work packages, which simplifies coordination on site.

02Does In All Africa (IN2A) work outside Casablanca?

Yes. In All Africa (IN2A) is based in Casablanca and works throughout Morocco, from Tétouan to Agadir and from Oujda to Tiznit.

03Can In All Africa (IN2A) be entrusted with both the transformer substation and the low-voltage distribution?

Yes. In All Africa (IN2A) carries out the grid connection, the MV/LV substation, the main low-voltage switchboard (TGBT) and the distribution, as it did for the accommodation buildings of the Lycée d’Excellence in Benguerir (1,000 kVA substation, TGBT switchboards and LV distribution).

04What is a TGBT?

The TGBT, or main low-voltage switchboard, is the main switchboard of a site. It receives energy from the transformer or the grid, shares it out among the distribution boards and houses the main protective devices. For example, In All Africa (IN2A) built the TGBT switchboards for the accommodation buildings of the Lycée d’Excellence in Benguerir.

05Generator set or UPS: which should you choose?

The two meet different needs. A generator set takes over the supply of the site a few moments after a grid outage. A UPS supplies sensitive equipment, such as IT, without interruption, for a time limited by its batteries. They are often combined, and In All Africa (IN2A) installs both.

06Does In All Africa (IN2A) carry out the electrical work for new industrial buildings?

Yes. In All Africa (IN2A) carried out the electrical installation of the new Fenie Brossette manufacturing unit in Tit Mellil and that of the BIM depots in Casablanca, as well as the electrical installations of the new Casa Port terminal. A work package of this kind generally brings together distribution, switchboards and lighting.

Let’s talk about your project

An electrical work package to price?

A work package to price, a substation to renovate, a home to equip: tell us what you need and we will get back to you.