Grid connection and MV/LV substations
From the public distribution grid to the substation on your site.
- Connection to the public grid
- MV/LV transformer substations
- Reactive power compensation
- Harmonic filtering

Grid connection, MV/LV substations, distribution, lighting and standby power: In All Africa (IN2A) designs and builds the entire electrical chain of your site.
Power systems carry energy: they supply the machines, the lighting, the air conditioning and every socket in a building. On an industrial or commercial site, this work package starts at the point of connection to the public grid and ends at the fittings installed in each room.
In All Africa (IN2A) designs power systems installations (CFO) and carries out the works. A single team handles the grid connection, the transformer substation, the main distribution, the switchboards and the final circuits, which avoids gaps in responsibility between work packages.
A model of principle: typical equipment, not the mock-up of a particular installation. Schematic diagram: it shows how the parts follow one another, not the drawing of a particular installation.
A factory, a store or a public institution cannot stop at every grid outage. In All Africa (IN2A) installs the generator sets and the UPS-backed and standby networks that take over, and deals with the quality of the power distributed through reactive power compensation and harmonic filtering.
We also integrate on-site generation, with photovoltaic (solar PV) and cogeneration, and protect installations against lightning and surges.

The power systems work package concerns any client who is building, extending or upgrading a building: manufacturers, retail chains, property developers, public authorities. In a new build, the installation is designed along with the building, as it was for the new Fenie Brossette manufacturing unit in Tit Mellil or the OFPPT institute and boarding school in Tafraout. In an extension, the question becomes one of available power and of the space left in the existing switchboards.
On an occupied site, the work is organised around the activity. Shutdowns are prepared with the operator, the new switchboards are assembled and wired before the changeover, and the circuits are taken over area by area so that the rest of the site keeps running. In All Africa (IN2A) also takes on one-off jobs: adding or replacing a switchboard, modifying a cabinet, connecting machines or production equipment.
The TGBT, the main low-voltage switchboard, is the point from which the whole distribution of a site starts: it receives energy from the transformer or the grid and shares it out among the distribution boards. Its sizing follows from the load assessment, that is, the inventory of the equipment to be supplied and of how much of it runs at the same time. An underestimated load assessment leads to repeated tripping and to a switchboard that is full at the first extension.
The study also settles the selectivity of the protective devices: if a fault occurs on a circuit, only the nearest protective device should open, so that the rest of the site stays supplied. Lastly, it determines the cable sizes, the cable routes and the spare capacity set aside for future needs. In All Africa (IN2A) draws up these calculations before the works, then checks the installation through tests before commissioning.
The power systems installations designed by In All Africa (IN2A), package by package.
From the public distribution grid to the substation on your site.
The main and sub-distribution of your buildings.
Continuity of supply and on-site generation.
Lighting installations, from design study to commissioning.
The protection of equipment and buildings.
From the first site visit to the upkeep of the installation.
We study your drawings, your specification and the list of equipment to be supplied in order to draw up the load assessment of the site.
We size the TGBT, the boards, the cables and the protective devices, then give you a detailed offer, package by package.
Our teams install the cable trays, the switchboards and the fittings, connect the circuits and check the installation before it is energised.
After commissioning, we support you in the operation, maintenance and later changes of your electrical installation.
RetailElectrical works, fire detection, voice alarm sound system, intrusion detection, access control, video surveillance, structured cabling.
IndustryUpgrade of the plant’s electrical substation to the standards in force.
CommercialElectrical works, light fittings and fire detection.
EducationPower and low-current systems, 1,000 kVA substation, TGBT switchboards and LV distribution.
PortsRenovation of the transformer substations at the commercial port.
IndustryElectrical installation, telephony and fire detection system.
Client, scope of work and city, as they appear in our list of references.
Power systems carry the electrical energy that supplies equipment: distribution, lighting, motive power. Low-current systems carry information: IT networks, telephony, fire safety, access control, video surveillance (CCTV). In All Africa (IN2A) delivers both work packages, which simplifies coordination on site.
Yes. In All Africa (IN2A) is based in Casablanca and works throughout Morocco, from Tétouan to Agadir and from Oujda to Tiznit.
Yes. In All Africa (IN2A) carries out the grid connection, the MV/LV substation, the main low-voltage switchboard (TGBT) and the distribution, as it did for the accommodation buildings of the Lycée d’Excellence in Benguerir (1,000 kVA substation, TGBT switchboards and LV distribution).
The TGBT, or main low-voltage switchboard, is the main switchboard of a site. It receives energy from the transformer or the grid, shares it out among the distribution boards and houses the main protective devices. For example, In All Africa (IN2A) built the TGBT switchboards for the accommodation buildings of the Lycée d’Excellence in Benguerir.
The two meet different needs. A generator set takes over the supply of the site a few moments after a grid outage. A UPS supplies sensitive equipment, such as IT, without interruption, for a time limited by its batteries. They are often combined, and In All Africa (IN2A) installs both.
Yes. In All Africa (IN2A) carried out the electrical installation of the new Fenie Brossette manufacturing unit in Tit Mellil and that of the BIM depots in Casablanca, as well as the electrical installations of the new Casa Port terminal. A work package of this kind generally brings together distribution, switchboards and lighting.

Who decides what, when and with whom: this guide follows a transformer substation project as the client experiences it, from the first power estimate to the handover of the documentation.
Read the guide
In All Africa (IN2A) has delivered the electrical work package of several Decathlon stores in Morocco. This checklist sets out, in the order of the project, what the person in charge of an opening has to decide, follow, check and keep.
Read the guide
References, design, team, tests, maintenance: the questions to ask before entrusting an industrial or commercial project to an electrical contractor, and how to compare quotes that do not all cover the same thing.
Read the guideRelated services.
Indoor, outdoor, LED
Solar, wind, hydro, geothermal, biomass
Power supply and control of stations
Construction, renovation, maintenance
Networks, safety, building control