Construction and supply of substations
For industrial, commercial and public buildings.
- Supply
- Installation
- MV/LV equipment

Construction, 22 kV connection, renovation, compliance upgrades and maintenance: In All Africa (IN2A) works on the substations of factories, ports and public institutions.
The MV/LV substation receives energy from the medium-voltage (MV) grid and transforms it into low voltage (LV) that the site can use. A factory, a port, a large retail store or a public institution depends on it entirely: when the substation stops, everything stops.
In All Africa (IN2A) builds and equips new substations, connects sites to the 22 kV grid by overhead-to-underground or underground connection, and works on existing substations to renovate them, upgrade them for compliance or replace their medium-voltage equipment.
A model of principle: typical equipment, not the mock-up of a particular installation. Schematic diagram: it shows how the parts follow one another, not the drawing of a particular installation.
An old substation can be brought up to standard without rebuilding the site. In All Africa (IN2A) renovated the transformer substations of the Agadir commercial port for Marsa Maroc, carried out the compliance upgrade of the electrical substation at the Centrale Danone factory in Salé and replaced the MV switchgear cubicles and MV cables of the grain silos at the port of Casablanca.
Regular maintenance keeps the substation in operation: In All Africa (IN2A) provides general maintenance of transformer substations, for example for Laboratoires Sothema in Casablanca.

A new substation project starts with the power to be supplied: it follows from the load assessment of the site and determines the transformer. Next come the type of connection to the medium-voltage grid, overhead-to-underground or underground, and the location of the substation, which must remain accessible for operation and maintenance. These choices are settled early, because they govern the civil works and the route of the link.
In All Africa (IN2A) then supplies and installs the equipment: medium-voltage switchgear cubicles, transformer, low-voltage switchboard, links and earthing. The installation is checked and tested before it is energised, which is done in coordination with the electricity distributor. This is how we built and supplied the substation of the athletes’ training centre in Benslimane, and a 630 kVA substation with a 22 kV underground connection in Ifrane.
Working on a substation in service requires a shutdown, since the whole site depends on it. The challenge is to keep that shutdown short and predictable. The work is therefore prepared in advance: survey of the existing installation, delivery of all the equipment before the chosen date, choice of the time slot with the operator, during a production stoppage or a period of low activity. The switching operations and the isolation and lock-off are planned before the team arrives.
Depending on the condition of the substation, the work covers one item of equipment or all of it. At the Doukkala high-lift pumping station, In All Africa (IN2A) replaced a voltage transformer cubicle and medium-voltage contactors for ORMVAD. At the port of Safi, we protected the Marsa Maroc substations against surges. In Benslimane, the substation of the court of first instance was rehabilitated and restored, with its 22 kV overhead-to-underground connection.
On new substations and existing ones alike.
For industrial, commercial and public buildings.
The connection of your substation to the public distribution grid.
For substations already in service.
The replacement of medium-voltage equipment.
The protection of the substation and the quality of the power distributed.
General maintenance of transformer substations to keep your sites in operation.
From the first site visit to the upkeep of the installation.
On site, we record the characteristics of the substation or of its future location, the route of the connection and the operating constraints.
We specify the transformer, the medium-voltage switchgear cubicles, the low-voltage switchboard and the connection, then price the whole project.
We install the equipment, make the links and carry out the tests, then energise the substation in coordination with the distributor.
We then provide general maintenance of the substation and step in to upgrade it when its equipment ages.
IndustryUpgrade of the plant’s electrical substation to the standards in force.
Public sectorReplacement of a voltage-transformer cubicle and medium-voltage contactors.
Public sectorSecond-category overhead-to-underground electrical connection of the transformer substation.
EducationPower and low-current systems, 1,000 kVA substation, TGBT switchboards and LV distribution.
PortsRenovation of the transformer substations at the commercial port.
PortsProtection of the port’s HTA/MT/BT transformer substations.
Client, scope of work and city, as they appear in our list of references.
It is the installation that receives electricity from the medium-voltage grid (22 kV in our references) and steps it down to low voltage to supply a site. It comprises medium-voltage switchgear cubicles, one or more transformers and a low-voltage switchboard.
Yes. In All Africa (IN2A) carries out overhead-to-underground and underground 22 kV connections. For a quarry near Sidi Kacem, the connection was 2.6 km long and supplied a 1,250 kVA substation.
Not necessarily. Depending on its condition, a substation can be rehabilitated, restored or upgraded for compliance, and its medium-voltage switchgear cubicles or cables can be replaced. In All Africa (IN2A) has carried out this type of work for Marsa Maroc, Centrale Danone and the Société des Silos Portuaires.
The rating is derived from the load assessment: the sum of the equipment to be supplied, adjusted for how much of it runs at the same time, with spare capacity for extensions. The substations in our references go up to 1,250 kVA. Send us your equipment list so that we can study your needs.
In an overhead-to-underground connection, the site is supplied from a medium-voltage overhead line, then a buried cable runs to the substation. In an underground connection, the whole link is buried from the grid onwards. In All Africa (IN2A) carries out both, for example in Settat for OFPPT (overhead-to-underground) and at the Bouskoura industrial park (underground).
Yes. Surges, caused in particular by lightning or by switching operations on the grid, can damage the equipment of a substation. Protective devices can be added to an installation in service. In All Africa (IN2A) carried out the surge protection of the transformer substations of the port of Safi for Marsa Maroc.

Who decides what, when and with whom: this guide follows a transformer substation project as the client experiences it, from the first power estimate to the handover of the documentation.
Read the guide
References, design, team, tests, maintenance: the questions to ask before entrusting an industrial or commercial project to an electrical contractor, and how to compare quotes that do not all cover the same thing.
Read the guideFrom the installed power, a simultaneity factor, the power factor and a reserve, this tool gives an order of magnitude for the power of the transformer. A load study must then confirm it.
Open the toolA work package to price, a substation to renovate, a home to equip: tell us what you need and we will get back to you.