The transformer substations of two ports, renovated and protected.
For Marsa Maroc, In All Africa (IN2A) renovated the transformer substations of the commercial port of Agadir and provided surge protection for those of the port of Safi.
- Client
- Marsa Maroc
- Locations
- Commercial port of Agadir, port of Safi
- Client certificates
- 2013 (Agadir) and 2015 (Safi)
- Work package
- MV/LV substations
Agadir: renovating the substations of the commercial port
At a port, the transformer substations supply the quay equipment, the lighting and the operations buildings. In All Africa (IN2A) renovated the electrical transformer substations of the commercial port of Agadir. The Marsa Maroc certificate, dated 2013, states that the works were carried out in 2011.
Safi: protecting the substations against surges
At the port of Safi, In All Africa (IN2A) carried out the surge protection of the transformer substations (HTA/MT/BT). The certificate from the port’s operations department dates from 2015.
One client, two ports and two different jobs on substations in operation: renovation on one side, protection on the other.
Where these references are
The cities of the references listed on this page, linked to our head office in Casablanca.
- Agadir
- Safi
A model of principle: typical equipment, not the mock-up of a particular installation.
References
Client, scope of work and city, as they appear in our list of references.
Services involved
The In All Africa (IN2A) trades engaged on this type of project.
Substations to renovate or protect?
A work package to price, a substation to renovate, a home to equip: tell us what you need and we will get back to you.
- +212 522 212 298
- commercial@inallafrica.com
- 86, lot. Mandarouna, rue 23, Aïn Chock, Casablanca