Compliance upgrade of the electrical substation of a plant in operation.
At the Centrale Danone plant in Salé, In All Africa (IN2A) carried out the compliance upgrade of electrical substation “123”, including the handling and positioning of the transformer.
- Client
- Centrale Danone
- Location
- Salé
- Work package
- MV/LV substation
The project
The transformer substation supplies the whole plant. Centrale Danone entrusted In All Africa (IN2A) with the compliance upgrade, to the standards in force, of electrical substation “123” at its Salé site.
The works
The work covered the substation equipment. The site photos show the transformer being handled by forklift and set down on its frame, in front of the plant.
On a production site, this type of work is prepared around operations: the equipment is procured before the shutdown, and the return to service follows the tests.
Where these references are
The cities of the references listed on this page, linked to our head office in Casablanca.
- Salé
A model of principle: typical equipment, not the mock-up of a particular installation.
References
Client, scope of work and city, as they appear in our list of references.
Services involved
The In All Africa (IN2A) trades engaged on this type of project.
A substation to bring into compliance?
A work package to price, a substation to renovate, a home to equip: tell us what you need and we will get back to you.
- +212 522 212 298